Pre-Qualification for the Construction of a Pressure Reduction and Metering Facility in Albania

Trans Adriatic Pipeline (TAP) AG has launched the pre-qualification process for the construction of a fully operational pressure reduction and metering facility (South M/R Station) in Fier, Albania. The scope includes detailed design, procurement, installation including civil work, pre-commissioning and commissioning.

The facility is aimed to provide a connection from the Trans Adriatic Pipeline system, to facilitate a future gas flow into Albania.

The pressure reduction and metering facility in Albania is designed for an annual gas quantity of 0.7 bcm/a with a maximum transmission capacity of 80,000 Nm³/h. A bid for a maximum transmission capacity of 196,000 Nm³/h is also required.

Interested companies can submit an expression of interest (EoI) until 15 February 2019, by filling out the questionnaire below and sending it to peter.meuer@tap-ag.com.

Following the pre-qualification stage, TAP expects to issue the related invitations to tender (ITT) in March 2019. The contract is expected to be awarded in the summer of 2019, all as better specified in the pre-qualification and tender documents.

For any questions, please contact peter.meuer@tap-ag.com.

 