Search
You searched for "pipeline", this yielded 1621 results.
TANAP and TAP Complete Pipeline Connection
Earlier this month, TAP and the Trans Anatolian Pipeline (TANAP) successfully completed their connection with the final “golden weld”, which physically connected the two pipelines. This marks another significant milestone in the completion of the Southern Gas Corridor (SGC).
Over 87% of Trans Adriatic Pipeline Complete Three Years after Construction Start
Today marks the three year anniversary since the start of the Trans Adriatic Pipeline construction. To date, 98% of pipes are laid in the ground across Greece, Albania and Italy. Additionally, over 93% of the land along TAP’s route in Greece, Albania and Italy has been reinstated.
MoU signed between Solidarity Net (Social Solidarity and Relief Network) and TAP
The Social Solidarity and Relief Network and the Trans Adriatic Pipeline (TAP) proceeded on Thursday 5 May 2016 with the signing of a Memorandum of Understanding.
Safety near the pipeline
The Trans Adriatic Pipeline is a high-pressure pipeline transporting natural gas, built according to high standards with safety as its absolute priority. TAP uses 24/7 monitoring methods and regular patrols of the infrastructure along the pipeline route to maintain its integrity and safe operation.