Jump to content
Emergency

Contractual arrangement with shippers

The Gas Transportation Agreement (GTA) is the contract between Trans Adriatic Pipeline AG and a shipper for the transportation of gas of one or more capacity products.

1. The TAP Network Code (TNC)

The TAP Network Code governs the relationship between TAP and registered parties and is an integral part of each gas transportation agreement (GTA). 

The code sets out the rules and procedures for the operation of the TAP transportation system. It includes the requirements for booking capacity and details the rights and obligations of TAP, registered parties and shippers for the booking and use of capacity products. 

The TAP Network Code ensures TAP’s compliance with the relevant EU’s regulatory framework for transporting gas.  

2. General Terms and Conditions (GTCs)

TAP’s GTCs contain the commercial terms and conditions for the transportation of gas that apply to the GTA entered into by a shipper. The GTCs include a number of schedules with specific terms that apply to the different capacity products, and a schedule with relevant provisions of the TAP Tariff Code.

3. Transportation confirmation

The transportation confirmation sets out the specific details of a shipper’s reserved capacity booking.

How TAP operates

Trans Adriatic Pipeline operates 877 kilometres of pipeline, in line with world-class performance standards of preparedness and accountability.
Read more