Search
You searched for "annual report", this yielded 336 results.
Preliminary Environmental Impact Assessment (PEIA) Greece (in English)
On the 28th of September 2011, the Trans Adriatic Pipeline (TAP) announced that it has submitted Preliminary Environmental Impact Assessment (PEIA) to the Greek Ministry of Environment.This document was revised and resubmitted to the Greek authorities on the 8th of February 2012. This revision considers changes to the overall engineering concept of the project in which one compressor station...
ESIA Greece - Amendment 6 (in English)
The Second Amendment to TAP’s ESIA in Greece introduces changes to the location and design of the project compressor station in Kipoi (GCS00). Specifically, the package considers the following changes: a new location for the compressor station, southeast of the approved ESIA location; the pipeline rerouting leading to the new GCS00 location; access roads to the new GCS00 location; the water...
TAP's Code of Conduct
A gas infrastructure of the magnitude of the Trans Adriatic Pipeline is challenging and complex. We strive to minimise the associated risks through professional management and responsible behaviour.