Jump to content
Emergency

Search

You searched for "gas", this yielded 1019 results.

Safety near the pipeline

The Trans Adriatic Pipeline is a high-pressure pipeline transporting natural gas, built according to high standards with safety as its absolute priority. TAP uses 24/7 monitoring methods and regular patrols of the infrastructure along the pipeline route to maintain its integrity and safe operation.

TAP to Launch Invitation to Tender for the Purchase of Gas to be used during the Operations Phase

By 22 June 2020, TAP intends to publish on its corporate website an Invitation to Tender (ITT) outline for the purchase of gas required for operational activities, including the fuelling of the compressor stations. This tender is carried out in preparation for the start of the commercial operations phase, scheduled for the fourth quarter of 2020.

TAP Introduces First Natural Gas into the Albanian Section of the Pipeline as part of its Testing Phase

On 20 May, TAP started to introduce the first natural gas into a 4 km section of the pipeline in Albania, between the Greek – Albanian border and up to the TAP metering station in Bilisht. In line with national and international safety and operational standards, this is the initial stage of the pipeline testing process, which aims to ensure that the infrastructure is entirely safe and ready for...

ESIA Italy (in English)

TAP submitted its updated Environmental and Social Impact Assessment (ESIA) to the Italian Ministry of the Environment and Protection of Land and Sea on 10th of September 2013. The latest stage in a process, started in March 2012, will now see the final documentation go to consultation with all relevant national, regional and local authorities. Revised ESIA reflects feedback from the ongoing...

ESIA Italy (in Italian)

TAP submitted its updated Environmental and Social Impact Assessment (ESIA) to the Italian Ministry of the Environment and Protection of Land and Sea on 10th of September 2013. The latest stage in a process, started in March 2012, will now see the final documentation go to consultation with all relevant national, regional and local authorities. Revised ESIA reflects feedback from the ongoing...

Capacity booking process

Forward firm capacity is offered independently at each interconnection point. Registered parties must book forward firm capacity separately at TAP’s required entry and/or exit point(s). Subject to sufficient available capacity TAP offers forward firm capacity products, in the following order of priority, at each interconnection point:   forward firm yearly capacity for each of the next 15 gas...

Creditworthiness assessment

To demonstrate their financial strength and viability as a shipper, to the extent required by Trans Adriatic Pipeline’s Gas Transportation Agreement, organisations applying to become registered parties must undergo a creditworthiness assessment to establish their credit limit.

Usage charges

In addition to the tariff, shippers pay usage charges. Usage charges reflect the costs incurred by Trans Adriatic Pipeline in procuring fuel gas, unaccounted for gas, electric power and the cost incurred in order to comply with Regulation (EU) 2024/1787 (EU Methane Regulation).