Jump to content
Emergency

ESIA Greece - Amendment 3 (in English)

The Third Amendment to TAP’s ESIA in Greece describes a few minor changes in the location of selected block valve stations, pipe yards and campsites for the TAP project permanent facilities as well as in the pipeline route. The document assesses these changes’ impact on the natural, physical, cultural heritage and socio-economic environment. 

All modifications are considered minor and are not expected to result in any significant change in the impact on the environment and the communities along TAP’s route in Greece in comparison to TAP’s ESIA (as approved in September 2014 and amended in 2015 and 2016).

TAP’s Third ESIA Amendment in Greece has been approved by the Hellenic Republic Ministry of Environment and Energy in June 2016. The relevant ESIA Reports are available below.

Greece ESIA Amendment 3 - Report [PDF]

download PDF

Greece ESIA Amendment 3 - Document Guide [PDF]

download PDF

Annex 1 – Decision on Approval of Environmental Terms [PDF]

download PDF

Annex 2 - Approved Project Technical Drawings and Layouts [PDF]

download PDF

Annex 3 – Project Modification Documentation [PDF]

download PDF

Annex 3.1 [PDF]

download PDF

Annex 3.2 [PDF]

download PDF

Annex 3.3 [PDF]

download PDF

Annex 4 – Reporting Form Y according to Law 4041 [PDF]

download PDF

Annex 5 – ESIA Third Amendment IP List [PDF]

download PDF

Annex 6 - Correspondence with Authorities [PDF]

download PDF