Search
You searched for "map", this yielded 533 results.
TAP: launch of the survey for data collection on the territory
TAP will begin, starting from July 3, a series of surveys in the local area, with the aim to collect the data about the residents, needed to update the ESIA documentation, as the Italian legislation and international requirements, and to complete the feasibility studies on the project. The surveys were approved through a Decree of the Prefecture of Lecce, dated June 7th, and published in the...
Home
TAP is a TSO and an ITO, providing capacity to shippers interested in transporting gas in a safe, reliable and efficient manner. TAP works to national and international safety and operational standards.
Marine Survey in the Adriatic Sea to Verify Offshore Route for TAP
The Trans Adriatic Pipeline project is planning a seabed survey in the Adriatic Sea to start on the 26th of January to verify the route for the underwater section of the new gas pipeline. The offshore pipeline will have a diameter of 1.05 meter and a length of approximately 115 kilometres.
TAP starts route assesment survey in Albania
The Trans Adriatic Pipeline project started route assesment survey in Albania on 1st of July, 2009. The goal of the survey is to determine an optimal routing for the future pipeline and to avoid problematic areas.
Usage charges
In addition to the tariff, shippers pay usage charges. Usage charges reflect the costs incurred by Trans Adriatic Pipeline in procuring fuel gas, unaccounted for gas and electric power.