Search
You searched for "natural gas", this yielded 744 results.
TAP strengthens its Italian team Giampaolo Russo appointed as Country Manager
The Trans Adriatic Pipeline (TAP) has today strengthened its team in Italy with the appointment of Giampaolo Russo, who takes position as TAP Italy’s Country Manager, effective 15 October 2012. Paul Pasteris, will continue to work for TAP and to develop the project in Italy.
TAP begins ESIA submission process in Albania
The Trans Adriatic Pipeline begins the formal Environmental and Social Impact Assessment (ESIA) process, with the submission of the Scoping Report. The document was presented to the Albanian national and regional authorities, as well as to more than 100 other relevant stakeholders. It meets the Best Practice Guidelines laid down by the European Bank of Reconstruction and Development (EBRD).
Trans Adriatic Pipeline hires Ricardo Ruiz Nuñez as Operations Director
Ricardo joins TAP with almost 20 years of experience in the management, development and implementation of operational strategies, working for various Enagás facilities throughout his career. He joins TAP from Compañia Operadora de gas del Amazonas in Peru, where he worked as Chief Operations Officer since 2015.
The Trans Adriatic Pipeline is Complete
After almost four and a half years since the start of construction, the Trans Adriatic Pipeline is substantially complete. The TAP pipeline has been filled with natural gas from the Greek-Turkish border up to the pipeline receiving terminal in Southern Italy.
Trans Adriatic Pipeline begins ESIA submission process in Greece
Scoping Report on the Environmental and Social Impact Assessment is submitted to the Greek authorities and available for public to comment.
TAP Awards Two Contracts for Italy Onshore Construction
TAP has awarded a contract for the Engineering, Procurement and Construction (EPC) of the Pipeline Receiving Terminal (PRT) and a contract for the EPC of the onshore pipeline in Italy (8-kilometre, 36-inch diameter).
Italian Ministry of Environment grants TAP additional nine months to submit ESIA application
TAP has agreed with the Italian Ministry of Environment to extend the suspension of its Environmental & Social Impact Assessment (ESIA) application in Italy for an additional nine months - until September 2013.
TAP to launch tender for the purchase of gas used for its own operations
Baar, Switzerland. Trans Adriatic Pipeline AG (TAP) is to publish on its website an Invitation to Tender (ITT) outline for the purchase of gas required for its operational activities, including for fuelling its compressor stations, by 28 March 2025.
Trans Adriatic Pipeline prepares for Italian surveys along the proposed pipeline route
TAP will restart its technical works in Italy when it carries out a number of onshore and offshore surveys in the area around San Foca, starting during the month of September.
TAP and DESFA Sign Agreement for the Maintenance of TAP’s Greek Pipeline section
The agreement was ratified by the competent Regulatory Authority for Energy (RAE) on December 12, 2018. The maintenance agreement covers a period of 5 years, following the beginning of TAP’s commercial operation in 2020, while the contract also includes pre-operational support.
Trans Adriatic Pipeline (TAP) begins pre-qualification process for steel producers
TAP has reached an advanced stage in its project development and begins a pre-qualification process, inviting steel pipe producers to an expression of interest, in preparation for construction.
View from the Outside: "TAP invests in young scientists"
We sat down with Evangelos Siskos, a Professor at the Department of International and European Economic Studies of the University of Western Macedonia, to discuss the social, environmental and educational impact impact of this initiative.
TAP sponsors Albanian Gas Market Development Symposium in Tirana
Highlighting opportunities for Albanian gasification. Live video streaming of the event.
TAP completes successful Euros 3.9 billion project financing
As one of Europe’s most strategic projects, TAP successfully completed financial close in December 2018, securing Euros 3.9 billion - the largest project finance agreed for a European infrastructure project in 2018. The financing is provided by a group of 17 commercial banks, alongside the EBRD and the European Investment Bank (EIB). Part of the financing is covered by the export credit...