Search
You searched for "market test", this yielded 281 results.
TAP delivers 50 billion cubic metres of natural gas to Europe
The milestone highlights TAP’s strategic contribution to Europe’s energy security and sustainable transition
TAP Renovates the Struma’s village school in Roskovec
The renovation of the “7 Dëshmorët” School, an investment of Euro 567,000, is part of the Trans Adriatic Pipeline’s Social and Environmental Investments in Albania. The works comprised the complete renovation of the building, equipment of the classrooms with the necessary academic materials, and the improvement of the school grounds.
TAP continues to receive strong political support in South Eastern Europe
The Ministers of Foreign Affairs of six countries – Albania, Bosnia and Herzegovina, Croatia, Greece, Italy and Montenegro – met in Dubrovnik, Croatia, on 12th June to demonstrate their support for the Trans Adriatic Pipeline (TAP) and for the Ionian Adriatic Pipeline (IAP).
TAP submits Environmental and Social Impact Assessment to the authorities in Greece, starts public disclosure
Athens, Greece. After almost four years of intensive pipeline route selection and refinement in Greece, TAP has submitted its comprehensive Environmental and Social Impact Assessment (ESIA) to the Ministry of Energy, Environment and Climate Change.
TAP’s Progress in Greece: First Hydrotest Completed
TAP successfully completed its first hydrotest, a method for verifying a pipeline’s safety. The hydrotest was applied to the pipeline’s first 1.4 km of the Greek section. Commenting on the first hydrostatic testing of the pipeline, TAP’s Country Manager for Greece, Rikard Scoufias hailed it as a big step that marks yet another important milestone in the construction process, as the project...
TAP Introduces First Natural Gas into the Greek Section of the Pipeline as part of its Testing Phase
On 25 November, TAP started to introduce the first natural gas into a 2km section of the pipeline in Greece between the Evros river and the Kipoi compressor station. This is the initial stage of the pipeline commissioning process, which aims to ensure that the infrastructure is entirely safe and ready for operations after the completion of the process, in line with national and international...
Trans Adriatic Pipeline Completes Offshore Section
TAP successfully completed the 105 km long offshore section of the pipeline across the Adriatic Sea. This milestone includes several deliverables, such as the offshore installation of 36-inch pipes by Castoro Sei, Saipem’s semi-submersible pipelaying vessel, the above-water-tie-in with the onshore infrastructure in Albanian waters, as well as hydrotesting the asset to ensure it is safe and...
TAP Launches Offshore Construction Works in Albania | Preparations Start for Offshore Pipe Installation at Albanian Landfall
On 19 October 2018, TAP marked the start of construction works for the 105km offshore pipeline section. The physical offshore pipeline installation is planned to be carried out in 2019, as per TAP’s schedule.The milestone was celebrated in a ceremony attended by Edi Rama, the Prime Minister of Albania, Damian Gjiknuri, the Minister of Infrastructure and Energy, Armando Subashi, the Mayor of...
TAP starts seabed survey north of Vlore in south-eastern Albania
The purpose is to collect samples of the seabed soil near the Albanian coast.
TAP Launches Binding Phase of its Market Test
Baar, Switzerland. Trans Adriatic Pipeline (TAP) AG today launches the binding phase of its market test with an information phase, which provides two months lead time until actual bids may be submitted, starting 17 July 2021.
TAP Invites Companies to Pre-Qualify for Telecommunications and Security Systems
TAP has launched its pre-qualification process for the engineering, procurement, installation and management (EPIM) of telecommunications and security systems. These elements will create a global network connecting the different pipeline technologies in TAP’s host countries, including the fibre optic network, the data centres in Italy and Switzerland, the compressor stations in Greece and...
Integrated QHSE management system
TAP’s integrated QHSE management system (QHSE MS) covers all operational activities, and all corporate activities at our headquarters in Switzerland and offices and sites in Greece, Albania and Italy.
“A pipeline traversing Greek history”
Athens, Greece. Trans Adriatic Pipeline (TAP) AG announces the completion and publishing of “A pipeline traversing Greek history”, a 295-page bilingual book. The book, which is the result of TAP’s close collaboration with the Greek Ministry of Culture and Sports, documents the important archaeological findings that were unearthed during the construction of the pipeline.
Privacy notice
This Privacy Notice was updated on 16 July 2024