Jump to content
Emergency

Search

You searched for "snam", this yielded 356 results.

ESIA Greece - Amendment 4 (in English)

The fourth Amendment to TAP’s ESIA in Greece describes two minor changes on the pipeline route in the areas of Ano Grammatiko (Municipality of Edessa) and Pentalofos (Municipality of Oreokastro). The document assesses these changes’ impact on the natural, physical, cultural heritage and socio-economic environment. These modifications are considered minor and are not expected to result in any...

TAP Launches Network Code Consultation

TAP launches its consultation process on its draft TAP Network Code (TNC). The TNC sets out the principles and rules which will govern the access, use and operation of the TAP pipeline. It is also a requirement that forms part of the European Commission’s decision on the exemption of TAP from the EU’s Third Gas Directive in relation to third party access, tariff regulation and ownership...

ESIA Greece - Amendment 6 (in English)

The Second Amendment to TAP’s ESIA in Greece introduces changes to the location and design of the project compressor station in Kipoi (GCS00). Specifically, the package considers the following changes: a new location for the compressor station, southeast of the approved ESIA location; the pipeline rerouting leading to the new GCS00 location; access roads to the new GCS00 location; the water...

TAP Launches Offshore Construction Works in Albania | Preparations Start for Offshore Pipe Installation at Albanian Landfall

On 19 October 2018, TAP marked the start of construction works for the 105km offshore pipeline section. The physical offshore pipeline installation is planned to be carried out in 2019, as per TAP’s schedule.The milestone was celebrated in a ceremony attended by Edi Rama, the Prime Minister of Albania, Damian Gjiknuri, the Minister of Infrastructure and Energy, Armando Subashi, the Mayor of...