Jump to content
Emergency

Search

You searched for "natural gas", this yielded 744 results.

TAP and the Bodossaki Foundation Join Forces to Implement Social and Environmental Initiatives in Greece

TAP and the Bodossaki Foundation announce the beginning of their collaboration to identify, prepare, implement and monitor social and environmental initiatives (SEI) in Greece. The Bodossaki Foundation is one the most significant public-benefit organisations in Greece. It brings to the partnership extensive experience and many years of expertise in planning, assessing, implementing and...

TAP Donates 20 Ambulances to the Greek Emergency Aid Services

Thessaloniki, Greece. On 22 January 2018, the National Emergency Aid Centre (EKAV) and TAP held an event for the delivery of 20 new ambulances. This is the second phase of the total sponsorship of 33 ambulances (as 2 have already been delivered to the Kilkis Hospital), offered by TAP to EKAV in the context of the transregional programme DESTINATION, SAFETY | Donation of Utility Vehicles that...

Over 50% of TAP Pipes in Greece in the Ground

TAP's construction progress was presented by TAP’s Country Manager for Greece, Katerina Papalexandri, at the 2nd Thessaloniki Summit held on 5-6 October at the Ioannis Vellidis Congress Centre. In the context of "The new energy map in the region" panel, Katerina Papalexandri noted the importance of the project for Greece, the wider area of Southeast Europe, as well as the continent as a whole....

CS

Compressor Station. Facility which helps the transportation process of natural gas from one location to another. Natural gas, while being transported through a gas pipeline, needs to be constantly pressurized in certain distance intervals (from 40 up to 100 miles). The gas in compressor stations is normally pressurized by special turbines, motors and engines.

First TAP pipes arrive in Albania

TAP announced the arrival of the first steel line pipes and machinery for the construction of the Albanian section of the pipeline. The occasion was marked by a ceremony in the Main Marshalling Yard of TAP, in the vicinity of Durrës. The ceremony was attended by Prime Minister Edi Rama, Minister of Energy and Industry Damian Gjiknuri, representatives of local authorities, TAP contractors,...

Privacy notice

                                                                                                                                                                                                                                                                This Privacy Notice was updated on 16 July 2024

TAP Holds Bank Presentation

The representatives of over 20 leading project finance banks attended an introductory meeting organised by the Trans Adriatic Pipeline AG (TAP) in London. TAP is planning to raise limited recourse finance from multilateral agencies, export credit agencies and commercial banks in 2016.

TAP Received ISO 14001 Certification

In April 2018, TAP's environmental management system, that covers all pipeline construction activities in Italy, Albania and Greece as well as TAP corporate activities, has been certified according to the International Organisation for Standardisation (ISO) 14001:2015 standard. Obtaining this certification is an assurance that TAP has in place industry best practice environmental processes and...

TAP Marks Start of Construction in Albania

The occasion was marked by an inauguration ceremony near the town of Fier, attended by the Prime Minister of Albania, Edi Rama, Minister of Energy and Industry, Damian Gjiknuri, and TAP Managing Director, Ian Bradshaw. As one of the largest foreign investments in the country, TAP will have a positive impact on the country’s energy sector and will help encourage other foreign investments, Prime...

Greek Prime Minister Alexis Tsipras Visits TAP Site in Alexandroupoli

Six months after inaugurating the construction of the TAP in an official ceremony held in Thessaloniki, on Friday 25 November, the Greek Prime Minister Alexis Tsipras visited the project’s works currently under way in Alexandroupoli. The Prime Minister was welcomed on site by Ian Bradshaw, TAP Managing Director, Rikard Scoufias, Country Manager for Greece, and Ulrike Andres, Commercial &...

TAP and TANAP sign Agreement for Cooperation during Construction

In November 2015, the Trans Anatolian Natural Gas Pipeline Company (TANAP) and the Trans Adriatic Pipeline AG (TAP) signed an Agreement for Cooperation during Construction (ACC). The document stipulates the responsibilities for constructing the interconnection and the technical specifications for connecting the two pipelines, further strengthening project alignment along the Southern Gas...

5,000 Years of History Brought to Light in Excavations in Thrace

Thrace, Greece. Archaeological remnants of human activity in Thrace from the Neolithic (4th millennium BC) to the post-Byzantine period have been brought to light from archaeological excavations, carried out in the context of construction works for the Trans Adriatic Pipeline (TAP) AG. This is supported by the findings of archaeologists who are employed in the area by the project and monitored...

TAP Invites Companies to Pre-qualify for Offshore Construction and Line Pipes

TAP has launched two pre-qualification contracts for the construction of the 105 km offshore pipeline section under the Adriatic Sea. The first pre-qualification comprises Engineering, Procurement, Construction and Installation works for the offshore section of the 36 inch pipeline between the coastlines of Albania and southern Italy.