Search
You searched for "axpo", this yielded 306 results.
THRIVING LAND - a €1 million Agricultural Project
On 31 October, TAP presented its agricultural initiative "THRIVING LAND | Supporting Agri-food Education," to be implemented in all three Northern Greek Prefectures traversed by the pipeline.
TAP Presents Project Update at the Athens Energy Forum
In Greece, TAP Country Manager for Greece Papalexandri noted, construction is ongoing in all three Northern Regions the pipeline traverses.
TAP Awards Onshore Construction Contracts for Albanian and Greek Pipeline Sections
TAP has awarded the contracts for the engineering, procurement and construction (EPC) of approximately 760km of cross-country onshore pipeline - 48 inches (1.2m) in diameter - in Greece and Albania. TAP’s construction is split into five lots (or sections) – three lots in Greece and two lots in Albania.
ESCH management construction
While it is not a statutory requirement of the host countries’ legislation to disclose the ESCH management system, TAP has disclosed this information in order to demonstrate compliance and to keep stakeholders fully informed.
TAP Provides €700,000 for Five Photovoltaic Parks in Western Macedonia, Greece
Kastoria, Greece. As part of its Social and Environmental Investment (SEI) programme, Trans Adriatic Pipeline (TAP AG) fully funded the construction of five photovoltaic parks (PV) in the Municipality of Kastoria, Western Macedonia, Greece, with a total installed capacity of 0.5MW and a value of approximately 700,000 euros.
ESIA Greece - Amendment 3 (in English)
The Third Amendment to TAP’s ESIA in Greece describes a few minor changes in the location of selected block valve stations, pipe yards and campsites for the TAP project permanent facilities as well as in the pipeline route. The document assesses these changes’ impact on the natural, physical, cultural heritage and socio-economic environment. All modifications are considered minor and are not...
2019 Market test
The 2019 Market Test has ended and no binding bids have been submitted. Interested parties are encouraged to follow the 2021 Market Test process, which was launched on 12 July 2021. You can find all relevant information here. Market tests are held at least every two years following the operation of TAP. TAP initiated a market test process in 2019 to assess market interest. It was structured in...
TAP to launch tender for the purchase of gas to be used for its own operations
By 1 August 2022, TAP will publish on its corporate website an Invitation to Tender (ITT) outline for the purchase of gas required for its operational activities, including the fuelling of the compressor stations.
“A pipeline traversing Greek history”
Athens, Greece. Trans Adriatic Pipeline (TAP) AG announces the completion and publishing of “A pipeline traversing Greek history”, a 295-page bilingual book. The book, which is the result of TAP’s close collaboration with the Greek Ministry of Culture and Sports, documents the important archaeological findings that were unearthed during the construction of the pipeline.
TAP transports first 10 bcm of natural gas to Europe
Baar, Switzerland. The Trans Adriatic Pipeline AG announces that a total of 10 billion cubic meters (bcm) of natural gas from Azerbaijan has now entered Europe via the interconnection point of Kipoi, at the Greek-Turkish border, where TAP connects to the Trans Anatolian Pipeline (TANAP). Out of these 10 bcm, approximately 8.5 bcm have been delivered to Italy.
TAP joins UNEP’s Oil & Gas Methane Partnership 2.0
TAP joined the Oil and Gas Methane Partnership (OGMP 2.0), the flagship oil and gas reporting and mitigation programme of the United Nations Environment Programme (UNEP). This voluntary initiative seeks to support Oil & Gas companies in reducing methane emissions.
TAP triggers the first level of capacity expansion
Baar, Switzerland. Trans Adriatic Pipeline (TAP) AG is pleased to confirm that following the completion of the first binding bidding phase of the 2021 Market Test, the Company will trigger the first level of capacity expansion.
TAP launches Public Consultation on the TAP Network Code
Baar, Switzerland. The Trans Adriatic Pipeline (TAP) AG will be conducting a public consultation on proposed revisions to the TAP Network Code between 20 December 2022 and 31 January 2023.
TAP signs an agreement with the Albanian Ministry of Culture to preserve the archaeological findings discovered during the pipeline’s construction
TAP and the Albanian Ministry of Culture signed an agreement for a project, which will catalogue, preserve, archive, and report the archaeological findings and artefacts discovered during TAP’s construction.
TAP donates a new fleet of firefighting vehicles to the Civil Emergencies in Albania
As part of its Social and Environmental Investment (SEI) programme, the Trans Adriatic Pipeline donated a fleet of 16 firefighting vehicles to 10 municipalities across the route of the pipeline in Albania.